WORKING ON THE WATER IN BOSTON 2003 - PAGE 6 |
|
Sunset in Salem Sound |
|
|
Lyman with the Ironmaster |
|
Modern Continental's LINA |
|
Majestic Princess |
|
BTT's workboat |
|
Lyman outbound with a load of dirt |
|
Fools out for a ride in the fog |
|
Felicia |
|
Northern Ave Bridge swinging open for us. Tunnel sections for the Big Dig went up the Fort Point Channel as well as supporting equipment to put them in place. |
|
|
Lina taking a crane barge up the Fort Point Channel |
|
Vincent Tibbetts holding the General Ship Graving Dock caisson in place. The tunnel sections were built in the graving dock and floated out as they became ready |
|
MBL's Seaport Belle |
|
Boston Harbor Islands State Park's wateer taxi IRENE |
|
Inbound at the Fore River Bridge with a water barge alongside |
|
Logan Airport shuttle Flying Cloud at her berth in the Fore River Shipyard |
|
Baxter alongside the water barge. Water was used by the rigs on the pipeline project |
|
Felicia assisting the C. Angelo with the Ironmaster |
|
Grace heading for Bang's Yard |
|
Bang's Yard |
|
|