MAINTOP MAINTOP MAINTOP MAINTOP MAINTOP MAINTOP
WORKING ON THE WATER IN BOSTON 2003 - PAGE 7
Fog creeping in around Long Island head

Loading equipment on a barge at a Long Island beach

Tall ship at Pemberton Pier
Outbound from Cashman's Yard at the McArdle Bridge
Boston Tow's Main Yard
Penn No 1 with the 400
Outbound Roehrig tug
R H Tripp
Flushing and Tripp at Cashman's Yard
BTT assisting an inbound container ship
Outbound USCG 47 footer
Waukegan
Freedom backing through the Fore River Bridge on a ship's bow
Liberty tailing her through the bridge
McDevitt Girls at rig with materials barge
Heading for the rigs with a load of drill pipe
Rigs and dredge working off of Georges Island. The pipeline was laid in a trench from Weymouth out to Georges Island, where the rigs did a bit of directional drilling and sent the pipeline under Georges Island and the Narrows to a trench again in Black Rock Channel off of Lovell's Island. The rock under Georges is granite and they went through many cutter heads drilling the hole for the pipe to pass through
Foggy sunrise
McDevitt Girls with materials barge
© 2009. Pat Folan. All Rights Reserved.