NEW YORK HARBOR - 2010 - PAGE 182 |
|
The Crow will go to the scrap dock on the right. We are headed through the Rock Cut to the next scrap dock.To see a video of this push up the Hutch, click here. |
|
|
Looking back from the second scrap dock. We had to turn around to make the swap out. |
|
Heading back down the Rock Cut with the loaded scrap barge on Gate Lines |
|
|
Looking at the Hutch )bridge) from the Cheyenne's lowered house
|
|
The Pelham Amtrak doesn't usually open right away so we have to drift for about 15 minutes. It is easier to drift well above the bridge. |
|
Pelham Amtrak open with the Parkway Bridge beyond. |
|
Through the Amtrak bridge and angling over for the Parkway Bridge |
|
Coming through the Parkway Bridge |
|
Heading out into Eastchester Bay. |
|
Mike, our engineer, looking over a potential Christmas gift! |
|
|
|