WORKING ON THE WATER IN BOSTON 2003 - PAGE 11 |
|
On Nov 3, 2003 the Flushing and Tripp moved a ship from the P & G berth at the mouth of the Back River to a terminal at it's head of navigation. Here the two boats are leaving Peddocks Island. |
|
Alma at her berth at P & G
|
|
I was on the Tripp and it was the bow boat |
|
The Flushing holding in the stern as the ship's lines are taken in |
|
Once the Alma was off the dock, we were just dragged along through the narrow channel until we were used at the next dock |
|
|
|
|
Once off the next dock, we both were worked up to 90's and pushed her in. |
|
|
Line handlers coming out to grab the bow lines |
|
Flushing after the job |
|
|
|
Benjamin Baxter off of Point Allerton - Peddocks Island in the background |
|
Flushing's builder's plate in her engine room |
.  |
Flushing's wheelhouse |
|
On a raw day in November, we had to flip a barge over to repair her bottom. The Flushing and Tripp pulled from one side while the Baxter stood by. She finally flipped over after much ballasting on one side. |
|
|
Baxter coming alongside the barge to let our lines go. |
|
Tripp heading back to Boston |
|
|