Bridges
of Boston Harbor
Chelsea Street
Bascule Span |
Vertical Clearance: 9 feet closed |
Horizontal Clearance: 93 feet |
|
Vertical Clearance: 83 feet open |
Water Depth: 32 ft mid-channel up to bridge |
Looking Upstream, Lowered |
 |
Looking UpStream, Raised |
 |
Looking UpStream, Going Down |
 |
Andrew P. McCardle
Bridge
Bascule Span |
Clearance: 21 feet |
Horizontal Clearance: 175 feet |
|
(617) 635-7536 |
Water Depth: 32 feet |
Bridge Open, Inbound |
|
Bridge Closed, Outbound |
 |
|
|
Mystic River - Tobin Memorial Bridge
Fixed Span |
Vertical Clearance: 135 feet |
Over 600 foot channel |
|
|
Water Depth: 35 feet |
Tobin Bridge from mouth
of the Chelsea Creek |
 |
Tobin Bridge, looking through the McCardle
Bridge |
 |
|
|
Alford Street -
Rt 99 (Malden Bridges)
Bascule Span |
Vertical Clearance: 12 feet closed |
Horizontal Clearance: 75 feet |
|
|
Water Depth: 19 feet |
Bridge Open, Inbound |
 |
Northern Avenue Bridge
Swing Bridge |
Vertical Clearance: 7 feet closed |
Horizontal Clearance: 75 feet |
|
|
Water Depth: 11 feet |
The New Northern Avenue Bridge is a fixed span,
just above the Northern Ave swing bridge. It has a vertical clearance
of 16 feet. The Congress Street Bridge above the new Northern Ave
Bridge is fixed with 6 feet of clearance. The fourth bridge on the
Fort Point Channel is the Summer Street Bridge with a vertical clearance
of 8 feet. |
Northern Ave Bridge closed |
 |
Northern Ave Bridge Open,
South Boston side (East Draw) is the navigable channel
|
 |
|
|
Neponset River Bridges
Fixed Bridge - Auto |
Vertical Clearance: 30 feet |
Horizontal Clearance: 80 feet |
2nd bridge from sea |
|
Water Depth: 19 feet |
Fixed Bridge - Train |
Vertical Clearance: 30 feet |
Horizontal Clearance: 109 feet |
1st bridge from sea |
|
Water Depth: 19 feet |
Fore River Bridge,
Quincy
Lift Bridge |
Vertical Clearance: 55 feet closed |
Horizontal Clearance: 175 feet |
|
Vertical Clearance: 175 feet open |
Water Depth: |
Heading Up River, Both Bridges Up |
 |
Heading Up River, Both Bridges Down |
 |
Heading Out ToSea, Both Bridges Down
Departing Fore River Staging Area, Quincy |
 |
|